First Periodic Report

Aller en bas

First Periodic Report Empty First Periodic Report

Message par INFRASTAR Mar 12 Avr - 8:18

Hello,

Ci-dessous le sommaire du first periodic report soumis dans le cadre d'Infrastar.
89 pages au total (j'ai laissé les numéros de page ci-dessous pour donner une idée des longueurs).
Et ensuite la feuille de route (mail envoyé aux membres du consortium) si ça peut aider.

SOMMAIRE

1 Explanation of the work carried out and overview of the progress 5
1.1 Explanation of the work carried in WP1: Monitoring and auscultation 5
1.1.1 Project 1: Advanced ultrasonic instrumentation for interferometric monitoring (BAM) 7
1.1.2 Project 2: Fibre optic sensor for fatigue monitoring (IFSTTAR) 10
1.1.3 Project 3: Sensor integration, data fusion and information management for industrial monitoring systems 12
1.1.4 Project 4: NDT parameters for fatigue damage identification in structural elements 16
1.1.4.1 Motivation 17
1.1.4.2 Monitoring of a road bridge 17
1.1.4.3 In-situ evaluation of NDT methods 17
1.1.4.4 Fatigue investigation using acoustic emission 19
1.1.4.5 Monitoring after enhancement: an experimental comparative study 19
1.1.4.6 Quantification of the value of monitoring data for fatigue safety evaluation 19
1.1.4.7 Expected benefits 19
1.2 Explanation of the work carried in WP2: Structural and action models 20
1.2.1 Project 5: Fatigue of reinforced concrete structural element (EPFL) 21
1.2.1.1 Motivation and objectives 22
1.2.1.2 Research work carried out up to date 22
1.2.1.3 Ongoing and future work 24
1.2.1.4 Expected benefits 25
1.2.1.5 Publications 25
1.2.1.6 References 26
1.2.2 Project 6: Reliability of structures exposed to traffic loads and environmental loading (IFSTTAR) 26
1.2.2.1 Motivation and objectives 26
1.2.2.2 Research work carried out up to date 27
1.2.2.3 Ongoing and future work 28
1.2.2.4 Expected benefits 28
1.2.2.5 Publications 28
1.2.3 Project 7: Lifetime cyclic behaviour of gravity base and suction bucket foundations for offshore wind turbines (GuD) 28
1.2.3.1 Motivation and objectives 29
1.2.3.2 Research work carried out up to date 29
1.2.3.3 Publications 33
1.2.4 Project 8: Fatigue of wind turbine concrete turbines (COWI) 33
1.2.4.1 General objectives 34
1.2.4.2 Research carried out up to now 35
1.2.4.3 General overview of the planned future work 35
1.2.4.4 Main results and how they will benefit to the engineering community 35
1.2.4.5 Publications 36
1.3 Explanation of the work carried in WP3: Reliability approaches for decision-making 36
1.3.1 Project 9: Fatigue reliability of concrete wind turbine and bridge elements (AAU) 38
1.3.1.1 Development of stochastic material model S-N approach 39
1.3.1.2 Development of stochastic action model for a bridge 40
1.3.1.3 Fatigue reliability analysis of Crêt de l’Anneau 41
1.3.1.4 Study of design parameter 43
1.3.1.5 Development of stochastic action model for a wind turbine (future) 45
1.3.1.6 Working with ESR1 and ESR2 (future) 45
1.3.2 Project 10: Optimal maintenance planning of existing structures using monitoring data 47
1.3.2.1 Objectives 47
1.3.2.2 Tasks and methodology 48
1.3.2.3 Achieved objectives and progress 50
1.3.2.4 Expected results 51
1.3.3 Project 11: Development of methods for risk assessment of wind turbine support structures and bridges 52
1.3.3.1 Material model by S-N approach for rebars 52
1.3.3.2 Bayesian network as a tool for decision-making 53
1.3.3.3 Risk assessment of ice and blade throwing away 54
1.3.3.4 Work and time plans 54
1.3.4 Project 12: Quantification of the value of monitoring information 56
1.3.4.1 Objectives and goals of the PhD project 57
1.3.4.2 Methods 57
1.3.4.3 Results 59
1.4 Explanation of the work carried in WP4: Recruitment and training strategy 69
1.4.1 Recruitment 69
1.4.2 Training strategy 70
1.4.2.1 Training week #01 71
1.4.3 Training week #02 72
1.5 Explanation of the work carried in WP5: Management, dissemination, outreach and business opportunities 73
1.5.1 INFRASTAR team 75
1.5.1.1 Supervisory board 75
1.5.1.2 Partner organisations 76
1.5.1.3 End User Advisory Board 77
1.5.1.1 The ESR representative 78
1.5.2 INFRASTAR meetings 79
1.5.3 Communication and dissemination 79
1.6 Impact 82
2 Deviations from Annex 1 84

FEUILLE DE ROUTE


Dear Work Package Leaders, dear Beneficiaries/Supervisors,

Below are important information about your contributions to be included in the deliverable "D5.4 - Draft periodic report". The report will be reviewed by the project officer as well as the external expert in order to prepare the mid-term review meeting (the external expert is not known yet).

Your contributions will be part of the core of the report (paragraph "Explanation of work & Overview of progress"). The report details the work carried out per Work Package by the beneficiaries during the reporting period (i.e. from the beginning of the project up to now) ; it gives an overview of the project results towards the objective (including a summary of deliverables and milestones) and a summary of exploitable results (with an explanation about how they can/will be exploited). It should demonstrate the achievements in relation to the initial objectives described in Annex 1 of the Grant Agreement. There is no page limit per work package - but your report should be concise and readable.

The deliverable "D5.4 - Draft periodic report" is due by April 30.

Here is a suggested way to do so:
Each beneficiary, i.e. each supervisor, writes a summary (work carried out, results, progress, future work, list of publications -done and future, figure(s) are welcome) to be sent to the respective work package leader (cc infrastar@ifsttar.fr) in order to help him to write an overall overview of his WP. Then, the WP leaders send their report (summaries of the supervisors + overall overview of WP) to infrastar@ifsttar.fr by Monday 23 April.
If all agree, I would therefore suggest that each beneficiary/supervisor sends their contribution to the respective WP leader at the latest on Monday 16 April.

Finally, please find attached the working document "INFRASTAR_D5.4_Draft-periodic-report_IFSTTAR_v00.docx" with the paragraphs to be filled in. Note that the name of each project is the one of the Annex 1 ; in case of change, this must be explained.
Also, for each WP, the deliverables and the milestones are compiled to ease your task, and, for each project, the objectives, the tasks & methodology, and the expected results (from the Annex 1) are listed for your convenience.

Pour info. Dans les livrables, nous avions un draft du periodic report à envoyer avant le mid-term meeting (à l'époque M24). C'est ce livrable dont il est question au-dessus (mais identique au periodic report).

Good luck & have fun (-:
A+
Hakim
INFRASTAR
INFRASTAR

Messages : 137
Date d'inscription : 07/08/2018

Revenir en haut Aller en bas

Revenir en haut

- Sujets similaires

 
Permission de ce forum:
Vous ne pouvez pas répondre aux sujets dans ce forum